韩国无码一二三区|伊人青青超碰青青|精品视频在线观看1区2日韩区3区|亚洲激情小说网站|无码免费婬AV片在线观看唐人|浪潮AV无码性色|AAA久久亚洲AV成人无码国产|伊人日韩在线精品一区超碰|国拍自偷麻豆黑丝在线视频|wwwww久久久

Electrolytic ion ground rod

Online Inquiry
Click Refresh Verification Code

Details

Electrolytic ion ground rod

The electrolytic ion grounding system is internally and externally equipped with two anion filling materials; the external filling material has the material with strong water adsorb-ability, strong adsorb-ability and high cation exchange capacity as the main body, and is fitted with various long-lasting resistance-reduction chemical materials with high anticorrosion capacity, high expansion coefficient without influence by temperature change and high-voltage impulse resistance; the internal filling material contains special charged ion compound, can thoroughly absorb the water in earth, effectively release the reactive charged ion into the earth through the deliquescent effect, promote the slow release and resistance reduction of the external part of the conductor, keep the resistance value stable for long term, and the grounding service life can reach up to 30 years.


Model

HD-LZDJ/A、B、C300

HD-LZDJ/ AB、C150

HD-LZDJ/ A、B、C100

Specification

Ф60/55*3000

Φ60/55*1500

Φ60/55*1250

Material

Copper, copper plating

Copper, copper plating

Copper, copper plating

Shape

Straight shaft

Straight shaft

Straight shaft

Weight (KG)

2118、15

1110、8

10、8、7

100Ω·m

Resistance reduction 2Ω

Resistance reduction 2Ω

Resistance reduction 2Ω

PH value

7±5%

7±5%

7±5%

Service life

More than 30 years

More than 30 years

More than 30 years

Remark

The internal and external walls are carried out the anticorrosion treatment.



Vertical hollow holes with the diameter of 160 mm are drilled on the chosen construction sites; multiple ion electrodes are vertically connected to form a group by adopting vertical deep well grounding mode if the construction sites are in rock zones or large-sized ground screen; multiple positions are chosen to drill hollow holes if there are several grounding systems, the transverse distance of the hole is more than two times of the vertical ground electrode, and the holes are communicated by horizontal grounding bus deeply buried more than 80 cm; the external filling material and water are mixed according to the proportion of 1:1, and are stirred uniformly into paste; then the paste material is filled in the gaps between the grounding electrodes and holes; and it shall be noted that the top ends of the grounding electrodes are exposed for installing an observing window for future observing.

Home
Tel
Message
Contact